OVERVIEW
The Program for Results-based (PforR) Rural Water Supply and Sanitation under the National Target Program will support NTP3 in eight geographically-clustered provinces: Phu Tho, Quang Ninh, Hanoi, Hung Yen, Bac Ninh, Ha Nam, Vinh Phuc, and Thanh Hoa.
The baseline verification is intended to verify the accuracy of the reported figures in the Provincial Plans, by conducting household and institutional surveys in the eight participating provinces on a sample basis. In addition, the baseline verification would physically verify 100% of water supply schemes under construction but not yet commissioned in the eight provinces.
OTHER RELATED PROJECTS
-
July 16, 2018
Client: The World Bank Time: 07 – 09/2018 Overview: Experimental research on willingness to pay…
-
September 21, 2017
OVERVIEW In April 2017, MDRI conducted the “Baseline Survey for Scaling up Rural Water Supply…